How to install a chain link fence. Stretch a string between each stake. Dig post holes 8″ wide and 18″ to 30″ deep, with vertical sides (the hole should not slope but be perfectly straight top to bottom. With crayon or chalk, mark the ground line on the posts. Once in place, the terminal posts should be the height of the fabric plus two inches.
What do I need to install a chain link fence?
To install a chain link fence, start by establishing your property lines and placing your post holes 4 inches inside those lines. Next, measure the total length of the fence and mark where each terminal post will go.
How to install chain link fencing?
Preparing for a Chain-link Fence. Check all local building codes and homeowner’s association guidelines for acceptable fence styles,size and placement.
Mark the Fence Layout. Before you can dig post holes,you need to lay out your fence area. Mark the layout using string and batter boards. Dig the Post Holes. Check local code for post hole size. Typically,the hole diameter should be about three times the width of the post. Install the Posts. The holes are dug,now add the posts. Install the Post Hardware. When installing the hardware,leave it loose at first. You’ll tighten the nuts and bolts after the fabric is installed. Install the Fence Rails. Fence rails are next in the assembly process. On the line posts,add the offset loop post tops with the offset toward the outside. Hang the Fence Fabric. Enlisting a helper is a good idea for this part. Attach the Gate. Finish the enclosure by hanging the gate. Attach the gate hinges to the posts about 8 inches from the top and bottom. How do you build a chain link fence?
Top Rail Sleeve connects two runs of top rail. Use one of these for every two top rails that need to be joined.
Gates come pre-assembled. Use one for each opening you wish to create. You can create a double opening using two gates. Gate Post Hinge to mount to the post. Use two for each swinging gate. Gate Frame Hinge to mount to the gate. Use two for each swinging gate. Brace Bands hold the rail ends and mount above the tension band.